FIgure 2

FIgure 2

Two new target areas were defined by high-resolution tills three kilometers southwest and 500 meters to the southeast of the limit of the 2018 drill program, which will be considered for future drilling.

Format

JPEG

Source

Auryn Resources Inc.

Downloads