Table 2: Significant Drill Results at Mryanka Target, the Obichnik Gold Project

Table 2

The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular. Drill intersections are calculated using a top-cut of 20g/t gold, a 0.2g/t gold trigger, a minimum 0.5g/t gold composite, and a maximum of 3 metres consecutive waste.

Format

PNG

Source

Velocity Minerals Ltd.

Downloads