639806.jpg


The District’s third and largest solar project, a 22-acre ground-mounted site built by ForeFront Power, is expected to produce 3.3 million kilowatt-hours (kWh) of clean electricity annually. The District is offsetting 58 percent of their annual energy consumption and reducing operating expenses by an estimated $4.5 million over a 20-year period. The project is part of the District’s ambitious initiatives around reducing operational costs from the existing grid. Guilderland Central is also one of the pioneering school districts in the state with sustainability initiatives, looking to reduce their carbon footprint while also improving student quality of life.

Format

JPEG

Source

ForeFront Power

Downloads