Figure 1.

Figure 1.

Plan view of the “10” Lens, “2” Lens, and “8-9” Lens/Horizon (red) and East Bounding Fault zone (transparent blue). The recently drilled holes are highlighted with a transparent box.

Format

JPEG

Source

Avrupa Minerals Ltd.

Downloads