Platreef’s engineering team members surveying at the 450-metre-level station, which will serve as an intermediate water pumping and shaft cable-termination station.

Platreef’s engineering team members surveying at the 450-metre-level station, which will serve as an intermediate water pumping and shaft cable-termination station.

Platreef’s engineering team members surveying at the 450-metre-level station, which will serve as an intermediate water pumping and shaft cable-termination station.

Format

JPEG

Source

Ivanhoe Mines Ltd.

Downloads