Platreef’s engineering team members surveying at the 450-metre-level station, which will serve as an intermediate water pumping and shaft cable-termination station.
Platreef’s engineering team members surveying at the 450-metre-level station, which will serve as an intermediate water pumping and shaft cable-termination station.
Format
JPEG
Source
Ivanhoe Mines Ltd.