Accessibility: Skip TopNav
October 2017 Mineral Resource Estimate (1,050ppm Li Cut-off)
The Indicated and Inferred Resource estimate for the South Basin is 460 million tonnes at 1,700ppm lithium and 0.46% boron
Format
JPEG
Source
Global Geoscience
Downloads
Original
Large
Medium
Small