Table 1: Significant Drill Results at Sedefche Gold Project
The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular. Drill intersections are calculated using a top-cut of 20 g/t gold, a 0.3 g/t gold trigger, a minimum 0.7 g/t gold composite, and a maximum of 1.5 metres consecutive waste.
Format
PNG
Source
Velocity Minerals Ltd.