Figure 5. 2018 Mine-site cash costs (includes all operational costs at mine site).

Figure 5. 2018 Mine-site cash costs (includes all operational costs at mine site).

Note: Represents mine-site cash costs that reflect the direct cash costs of producing paid concentrate or cathode incorporating mining, processing and mine-site G&A costs. Kakula is based on the average mine-site cash cost during the first 10 years as detailed in the Kakula 2017 PEA. Source: Wood Mackenzie (based on public disclosure, the Kakula 2017 PEA has not been reviewed by Wood Mackenzie).

Format

PNG

Source

Ivanhoe Mines Ltd.

Downloads