Plan view of the level access point on the 515m level at the T’Boli mine. The grades identified from each stoping location for July have been adjusted and fully reconciled based on the actual gold produced at the T’Boli mine site allowing adjustments for the estimate gold in tailings and changes to the surface stockpiles.