Figure 11. Projected 12 Mtpa Kamoa-Kakula production (year-nine peak copper production shown) compared to the world’s projected top 20 producing mines in 2025 by paid copper production.

Figure 11. Projected 12 Mtpa Kamoa-Kakula production (year-nine peak copper production shown) compared to the world’s projected top 20 producing mines in 2025 by paid copper production.

Note: Kamoa-Kakula production based on projected peak copper production (which occurs in year nine) of the 12 Mtpa development plan for the Kamoa-Kakula Project as detailed in the Kakula 2017 PEA. Source: Wood Mackenzie (based on public disclosure, the Kakula 2017 PEA has not been reviewed by Wood Mackenzie).

Format

PNG

Source

Ivanhoe Mines Ltd.

Downloads