Starfield Resources Inc.: High Grade Base and Precious Metal Assays in Massive Sulphides 'Pit Area'


VANCOUVER, British Columbia, July 19, 2005 (PRIMEZONE) -- Starfield Resources Inc. (OTCBB:SRFDF) (TSX-V:SRU): Phase One exploration resource delineation drilling assay results from the "Pit Area" of the West Zone are highlighted in Table I and Table II.


                                TABLE I
                 HIGHLIGHTS - PLATINUM AND PALLADIUM -
               MASSIVE SULPHIDE FOOTWALL MINERALIZATION
 ------ ------------ ------------ ------------- -------------- -----
 Hole   Inclination  Location       Interval(m)     Length      Cu  
 No.                                               (m) (ft)      %  
 ------ ------------ ------------ ------------- -------------- -----
 05-220 -75(degrees) 48+50W/2+00N 268.30-280.32 12.02  (39.44) 1.21 
 ------ ------------ ------------ ------------- -------------- -----
                        including 268.30-273.80 5.50   (18.04) 1.62 
 ------ ------------ ------------ ------------- -------------- -----
                              and 275.00-280.32 5.32   (17.45) 1.00 
 ------ ------------ ------------ ------------- -------------- -----
                              and 276.00-277.00 1.00    (3.28) 0.945
 ------ ------------ ------------ ------------- -------------- -----

 ------ ------------ ------------ ------------- -------------- -----
 04-181 -75(degrees) 48+50W/1+75N 259.55-276.75 17.20  (56.43) 0.754
 ------ ------------ ------------ ------------- -------------- -----
                        including 263.38-269.75 6.37   (20.90) 0.910
 ------ ------------ ------------ ------------- -------------- -----
                              and 266.75-267.75 1.00    (3.28) 1.053
 ------ ------------ ------------ ------------- -------------- -----

 ------ ------------ ------------ ------------- -------------- -----
 04-195 -75(degrees) 48+80W/1+75N 250.00-257.57 8.57   (28.12) 1.064
 ------ ------------ ------------ ------------- -------------- -----
                        including 250.97-255.60 4.63   (15.19) 0.944
 ------ ------------ ------------ ------------- -------------- -----

 ------  ----- ----- ---- ---- -----   
 Hole     Ni    Co   Pd    Pt  2 PGE   
 No.      %     %   g/t   g/t    (a)   
 ------  ----- ----- ---- ---- -----   
 05-220  1.06  0.143 3.74 0.31 4.05    
 ------  ----- ----- ---- ---- -----   
         1.04  0.140 3.70 0.29 3.99    
 ------  ----- ----- ---- ---- -----   
         1.31  0.177 4.53 0.38 4.91    
 ------  ----- ----- ---- ---- -----   
         1.326 0.178 5.13 1.28 6.41    
 ------  ----- ----- ---- ---- -----   
                                       
 ------  ----- ----- ---- ---- -----   
 04-181  0.732 0.103 2.79 0.27 3.06    
 ------  ----- ----- ---- ---- -----   
         1.147 0.164 4.30 0.50 4.80    
 ------  ----- ----- ---- ---- -----   
         1.173 0.168 4.84 1.32 6.16    
 ------  ----- ----- ---- ---- -----   
                                       
 ------  ----- ----- ---- ---- -----   
 04-195  0.684 0.086 2.59 0.24 2.83    
 ------  ----- ----- ---- ---- -----   
         1.129 0.144 4.21 0.37 4.58    
 ------  ----- ----- ---- ---- -----   
                     (a) 2PGE=Pt+Pd

Of particular interest in Table I is the 12-meter footwall massive sulphide intercept grading 1.21% Cu, 1.06% Ni, 0.143% Co, 3.74 g/t Pd and 0.31 g/t Pt encountered in hole 05-220. This intercept correlates well with the massive sulphides found in holes 04-181 and 04-195 drilled during the 2004 exploration campaign in the same area (Table I). This style of mineralization is characterized by higher grade base and precious metals (palladium plus platinum: 2PGE=4.05 g/t), content which is open to expansion.


                               TABLE II
     WEST ZONE : MAIN SULPHIDE LENS(ES), "PIT AREA", ASSAY RESULTS
 ------ ------------ ------------ ------------- ------------ -----
  Hole  Inclination    Location    Interval(m)     Length     Cu  
  No.                                            (m)   (ft)    %  
 ------ ------------ ------------ ------------- ------------ -----
 05-215 -60(degrees) 38+00W/1+90N 134.18-137.00 2.82  (9.25) 0.637
 ------ ------------ ------------ ------------- ------------ -----

 ------ ------------ ------------ ------------- ------------ -----
 05-216 -60(degrees) 37+60W/1+60N 108.75-110.00 1.25  (4.10) 1.057
 ------ ------------ ------------ ------------- ------------ -----

 ------ ------------ ------------ ------------- ------------ -----
 05-217 -50(degrees) 45+50W/1+70N 114.92-116.57 1.65  (5.41) 0.622
 ------ ------------ ------------ ------------- ------------ -----
                                  132.77-134.29 1.52  (4.99) 1.189
 ------ ------------ ------------ ------------- ------------ -----

 ------ ------------ ------------ ------------- ------------ -----
 05-218 -60(degrees) 45+50W/1+70N 131.45-141.00 9.55 (31.33) 1.21 
 ------ ------------ ------------ ------------- ------------ -----
                       (including 135.65-141.00 5.35 (17.55) 1.036
 ------ ------------ ------------ ------------- ------------ -----

 ------ ------------ ------------ ------------- ------------ -----
 05-219 -60(degrees) 48+50W/2+00N 157.64-165.26 7.62 (25.00) 1.15 
 ------ ------------ ------------ ------------- ------------ -----

 ------ ------------ ------------ ------------- ------------ -----
 05-220 -75(degrees) 48+50W/2+00N 203.25-206.50 3.25 (10.66) 1.10 
 ------ ------------ ------------ ------------- ------------ -----

 ------ ----- ------ ----- ----- ------- 
  Hole   Ni    Co     Pd    Pt    2 PGE  
  No.     %     %     g/t   g/t    (a)   
 ------ ----- ------ ----- ----- ------- 
 05-215 1.23  0.154  1.70  0.21    1.91    
 ------ ----- ------ ----- ----- ------- 
                                         
 ------ ----- ------ ----- ----- ------- 
 05-216 0.995 0.205  1.55  0.27    1.82    
 ------ ----- ------ ----- ----- ------- 
                                         
 ------ ----- ------ ----- ----- ------- 
 05-217 0.834 0.108  1.19  0.23    1.42    
 ------ ----- ------ ----- ----- ------- 
        0.736 0.092  1.32  0.14    1.46    
 ------ ----- ------ ----- ----- ------- 
                                         
 ------ ----- ------ ----- ----- ------- 
 05-218 0.898 0.113  1.65  0.22    1.87    
 ------ ----- ------ ----- ----- ------- 
        0.993 0.121  1.75  0.21   (1.96)   
 ------ ----- ------ ----- ----- ------- 
                                         
 ------ ----- ------ ----- ----- ------- 
 05-219 1.03  0.122  1.84  0.47    2.31    
 ------ ----- ------ ----- ----- ------- 
                                         
 ------ ----- ------ ----- ----- ------- 
 05-220 0.658 0.085  1.46  0.17    1.63    
 ------ ----- ------ ----- ----- ------- 
                          (a) 2PGE=Pt+Pd

To date, eight delineation drill holes have been completed in the "Pit Area" and main sulphide lens(es) assays for six holes have been received (Table II). Highlights include holes 05-218 and 05-219. Results for all PGE low-sulphide intercepts for the eight holes are pending.

Two drills are presently "infill drilling" between the 119 Zone and the West Zone as Phase One Exploration continues.

True thicknesses of the footwall-style mineralization are not yet known. Details concerning drill core sampling, sample preparation, accredited laboratory geochemical and assay analytical methods, QC and QA procedures can be referred to in detail in Press Release No. SRU-07-04, June 10, 2004, page 3.

On behalf of the Board of Directors,

"Glen C. Macdonald"

Glen C. Macdonald, P.Geo., Director

(Glen Macdonald is the Qualified Person under National Instrument 43-101 responsible for preparing the technical disclosure in this news release)

This communication to shareholders and the public contains certain forward-looking statements. Actual results may differ materially from those indicated by such statements. All statements, other than statements of historical fact, included herein, including, without limitations statements regarding future production, are forward looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.



            

Tags


Contact Data