Atlantic Petroleum spuds first of four development wells planned to be drilled in 2007 on the Ettrick Field


Atlantic Petroleum announces that the 20/2a-P1 Ettrick Development well has
been spudded. The well is the first of a series of four development wells to be
drilled back to back in 2007 on the Ettrick Field.

Attachments

26-03-2007 the drilling of ettrick wells commenced.pdf