Production from second Chestnut Production Well


Tórshavn, Faroe Islands 19th March 2009 - P/F Atlantic Petroleum (OMX: FO-ATLA)
the international upstream oil and gas company, today announces that the second
production well has now been connected to the subsea infrastructure and has
increased production from the field to approximately 2150 barrels of oil
equivalent per day (boepd) net to Atlantic Petroleum. From the strong well
performance and the ongoing reservoir modelling work it is expected that the
overall recovery from the field will be increased significantly compared to the
previous estimate of 1.5 MMboe net to Atlantic Petroleum. 

Atlantic Petroleum holds a 15% working interest in the part block 22/2a
containing the Chestnut field. 

The Chestnut field came on stream on 20th September 2008 with one production
well and one water injector tied-in to the Hummingbird FPSO. A second Chestnut
production well was sanctioned in May 2008, spudded in September and
successfully tested in November last year. Investment in this second production
well was sanctioned in May 2008 which means the well has been drilled and
brought on stream in less than 10 months. 

Commenting on the news, Wilhelm Petersen, Managing Director said:

“Chestnut was already delivering at the upper end of our expectations. By
adding this second well the Chestnut field has proved to be a very important
asset. We have sanctioned, drilled and brought this second well on stream in
less than ten months which is a reflection of the group's innovative use of
leading edge seismic techniques to identify further infill well opportunities.
The robust field performance and additional reserves we have proved up
validates our decision to develop Chestnut using the Hummingbird FPSO, the
first deployment of a cylindrical FPSO in the UK offshore sector.” 


Further Details
Further details can be obtained from Wilhelm Petersen, Managing Director, tel.
+298 350 100 (wilhelmp@petroleum.fo) or Teitur Samuelsen, Financial Manager,
tel. +298 350 100 (teiturs@petroleum.fo). This announcement will be available,
together with other information about Atlantic Petroleum, on the Company's
website: www.petroleum.fo. 

Announcement no. 07/2009

P/F Atlantic Petroleum  Issued 19-03-2009
Gongin 9	                  
P.O. Box 1228
FO-110 Tórshavn
Faroe Islands 
Telephone +298 350 100                 
Fax +298 350 101
Website: www.petroleum.fo



Notes to Editors:

Chestnut Field
•	The Chestnut field was discovered in 1986
•	Chestnut lies approximately 180km east of Aberdeen in a water depth of 120m
and is 13km south east of the Alba oil field 
•	The Chestnut field partners are:
o	Venture Production plc (operator) - 69.875%
o	Bow Valley Petroleum (UK) Limited - 15.125%
o	Atlantic Petroleum UK Limited - 15.000%
•	Atlantic Petroleum acquired an 15.0% interest in Chestnut in 2003 
•	FDP approval for Chestnut was obtained in late 2005 for a single production
well development with water injector support 
•	The water injector well (22/2a-12) was drilled in mid-2006 and showed good
pressure communication with the original production well 
•	First oil from Chestnut was achieved on 20th September 2008

Sevan Hummingbird
•	The Hummingbird floating platform is a Sevan 300 FPSO with an oil storage
capacity of 270,000 barrels 
•	The unit can carry up to three risers and umbilicals and has oil processing
capacity of 30,000 boepd and a water injection capacity of 20,000 barrels of
water per day