Results from drilling program gives new estimated mineral resource


 The diamond drilling program performed during the period May 2010 to February
2011 resulted in the definition of a new iron ore mineralisation, Norrnäs 3.
Modelling of Norrnäs 3 gave an estimated resource of 1.48 million ton averaging
34.3 pe rcent Fe and 2.0 per cent Mn.

 The drilling also provided additional information to the already defined
mineralisations Strömsmalmen and Botenhäll.

+--------------+-------------------+------------------+
|              | Measured resource |Indicated resource|
+--------------+---------+----+----+-------+----+-----+
|Mineralisation|Tonnage  |Fe %|Mn %|Tonnage|Fe %|Mn % |
+--------------+---------+----+----+-------+----+-----+
|Norrnäs 3     |1 448 328|34,3| 2,0| 29 434|35,1|  1,8|
+--------------+---------+----+----+-------+----+-----+

Drilling was carried out underground at the level -145 metres in the northern
part of the mine.

The program comprised 61 drillholes of which 39 drillholes penetrated the
Norrnäs 3 mineralisation.  A total of 564 samples were analysed by the
accredited laboratory ALS Minerals in Perth.  Sampling length was generally four
metres for the magnetite sections and two metres for the wall rock sections.

Results from this drilling program have been included in the calculation of a
new mineral resource for Dannemora mine.

New estimated mineral resource 2011
The new estimated measured and indicated resources in the Dannemora Iron
Deposit totals 33.60 million tonnes at a mean grade of 38.4 per cent Fe and 2.0
per cent Mn.
The new estimate results in an increased tonnage of 2.75 million tonnes compared
to the previous estimate from 2009, and also an increase in Fe and Mn grades.

Additionally a new inferred resource of 1.30 million tonnes has been estimated.

The main cause of the increase in tonnage is that grades between 20 and 30 per
cent have been included in the models, and a new better density function was
used.