Pampalo Q4/2012 production statistics and progress report – record gold production 277.4 kg and full year 866.5 kg


Endomines AB publishes its Fourth Quarter 2012 (ending Dec 31, 2012) production
results for its Pampalo Gold Mine in Eastern Finland. The mine produced 277.4 kg
or 8 920 oz, of gold during the period.

Pampalo Q4/2012 Production Results[1] (http://connect.ne.cision.com#_ftn1):

+---------------------------+-------+-------+---------+-------+---------+
|                           |Q1/2012|Q2/2012|  Q3/2012|Q4/2012|      YTD|
+---------------------------+-------+-------+---------+-------+---------+
|Tonnes mined               | 61,134| 57,718|   61,988| 69,950|  250,790|
+---------------------------+-------+-------+---------+-------+---------+
|Tonnes processed           | 61,596| 64,730|   64,177| 59,446|249,94900|
+---------------------------+-------+-------+---------+-------+---------+
|Head grade (Au g/t)        |    3.2|    4.4|      3.2|    5.4|      4.0|
+---------------------------+-------+-------+---------+-------+---------+
|Gold recovery (%)          |   85.6|   86.6|     85,5|   87.2|     86.1|
+---------------------------+-------+-------+---------+-------+---------+
|Hourly utilization (%)     |   86.5|   94.2|     95.0|   88.1|     91.0|
+---------------------------+-------+-------+---------+-------+---------+
|Gold produced kg           |  168.8|  244.5|    175.8|  277.4|  866.5.0|
+---------------------------+-------+-------+---------+-------+---------+
|Gold produced oz           |  5,427|  7,862|5,6520000| 8,9200|   27,860|
+---------------------------+-------+-------+---------+-------+---------+
|LTIFR[2] (12 month rolling)|     16|     11|       10|      9|        9|
+---------------------------+-------+-------+---------+-------+---------+

“Mining during the quarter took place from the high-grade areas. Good head grade
in combination with efficient mining resulted in the highest quarterly gold
production since inception of the mine. Whole year production is also very
satisfactory and we passed our guidance of 800 kg with a good margin”, said
Markus Ekberg, CEO of Endomines.

“Moreover, our continuous safety improvement efforts are also producing results
and this was the third consequent quarter without any Lost Time Injuries at
Pampalo. Our own workforce has now worked 643 days without accidents and our
contractors 294 days”, comments Markus Ekberg, CEO of Endomines.

The Pampalo processing plant capacity expansion project is progressing as
planned and on schedule. We do expect all installations to be completed in time
before the approval from the environmental authorities. As earlier communicated
the approval is expected to be received early 2013.

Endomines has applied for a capacity expansion to a maximum of 450 000 tonnes
per annum but expects to operate the plant at an annual capacity of 330 000 –
380 000 tonnes per annum. Additional ore production will be mined from the
Pampalo East open pit areas. Ore and waste rock mining has commenced by the
contractor Lemminkäinen Oy.

As earlier announced all laboratories used by the company as well as other
certified laboratories have reported serious overload problems resulting in
significant delays in the assaying work. This has also affected Endomines and
thus results from 2012 exploration campaign will be published when all relevant
results are available. The Company intends to publish the resource and reserve
update during the Q1/2013.

For further information, please contact:
Markus Ekberg
CEO of Endomines AB
tel. +358 40 706 48 50

__________________________________________

Endomines AB discloses the information provided herein pursuant to the Swedish
Securities Markets Act and/or the Swedish Financial Instruments Trading Act. The
information was submitted for publication at 11:00 CET on January 3rd, 2013.

About Endomines AB

Endomines AB is a Nordic mining and exploration company with its first operating
gold mine in production since February 2011. The mine is located in Eastern
Finland, on the Karelian Gold Line, a 40 km long gold critical belt, where
Endomines controls all currently known gold deposits.

The company has several other gold and industrial mineral properties at various
stages of development. All Endomines’ mineral assets are located in Finland,
which is politically stable, has a highly developed infrastructure and is ranked
as one of the most favorable jurisdictions for the mining industry.

Endomines aims to increase shareholder value by developing its strong portfolio
of assets, as well as exploring new deposits on the Karelian Gold Line and in
Finnish Lapland. The company will also consider new opportunities and
acquisitions for further growth.

The company’s business practices and mining operations are based on sustainable
principles and on minimizing the impact on the environment.

Endomines applies SveMin's&FinnMin's respective rules for reporting (public
mining & exploration companies). It has also chosen to report mineral resources
and ore reserves according to the JORC-code, which is the internationally
accepted Australasian code for reporting ore reserves and mineral resources.

The shares of Endomines AB are quoted on NASDAQ OMX Stockholm under ticker
ENDO.ST. Pareto Öhman acts as Liquidity Provider.

Read more about Endomines on www.endomines.com

__________________________________________________________________

This news release may contain forward-looking statements, which address future
events and conditions, which are subject to various risks and uncertainties. The
Company's   actual   results, programs and financial position could differ
materially from those anticipated in such forward-looking statements as a result
of numerous factors, some of which may be beyond the Company's control. These
factors include: the availability of funds; the timing and content of work
programs;   results   of exploration activities and development of mineral
properties, the interpretation of drilling results and other geological data,
the uncertainties of resource and reserve estimations, receipt and security of
mineral property titles; project cost overruns or unanticipated costs and
expenses, fluctuations in metal prices; currency fluctuations; and general
market and industry conditions.

Forward-looking statements are based on the expectations and opinions of the
Company's management on the date the statements are made. The assumptions used
in the preparation of such statements, although considered reasonable at the
time of preparation, may prove to be imprecise and, as such, undue reliance
should not be placed on forward-looking statements.

----------------------------------------------------------------------

[1] Production figures for Q4 are based on company own assaying and not
confirmed by any external laboratory. Figures are individually rounded. Cash
Cost USD/oz will be published in the Q4-report, due on 22nd February 2013.
[2] LTIFR = The Lost Time Injury Frequency Rate (LTIFR) is based on reported
lost time injuries resulting in one day/shift or more off work per 1,000,000
hours worked.