Endomines AB publishes its second quarter 2014 (ending June 30, 2014) production
results for its Pampalo Operations in Eastern Finland. The operation produced
195.7 kg (6,292 oz) of gold during the second quarter.

Pampalo operation Q2/2014 Production Results[1]:

Key production   Q1-2013  Q2-2013  Q3-2013  Q4-2013  Q1-2014  Q2-2014
figures by
quarter
Milled ore       58,856   80,939   93,460   96,328   107,866  104,688
(tonnes)
Head grade (Au   3.5      2.3      3.0      2.6      2.0      2.3
gram/tonne)
Gold recovery    88.4     86.7     82.6     82.8     81.6     80.3
(%)
Hourly           88.8     92.7     92.7     87.5     94.6     95.7
utilization (%)
Gold production  180.4    168.1    228.5    213.0    176.0    195.7
(kg)
Gold production  5,800    5,405    7,346    6,848    5,659    6,292
(oz)
LTIFR[2] (12     9        0        8        8        11       16
months rolling)


The milled ore tonnage exceeded for the second time 100,000 tonnes during the
quarter, which shows that the processing plant is of high technical quality. The
capacity utilization rate in the mill was again on very good level and amounted
to 95.7 %.

For further information, please contact:
Markus Ekberg
CEO of Endomines AB
tel. +358 40 706 48 50

or visit the Company´s home page: www.endomines.com

About Endomines AB
Endomines AB is a Nordic mining and exploration company with its first operating
gold mine in production since February 2011. The mine is located in Eastern
Finland, on the Karelian Gold Line, a 40 km long gold critical belt, where
Endomines controls all currently known gold deposits.

The company’s business practices and mining operations are based on sustainable
principles and on minimizing the impact on the environment.

Endomines applies SveMin's & FinnMin's respective rules for reporting (public
mining & exploration companies). It has chosen to report mineral resources and
ore reserves according to the JORC-code, which is the internationally accepted
Australasian code for reporting ore reserves and mineral resources. The shares
of Endomines AB are quoted on NASDAQ OMX Stockholm under ticker ENDO and on
NASDAQ OMX Helsinki under ticker ENDOM. Pareto Öhman acts as Liquidity Provider.

This news release may contain forward-looking statements, which address future
events and conditions, which are subject to various risks and uncertainties. The
Company's actual results, programs and financial position could differ
materially from those anticipated in such forward-looking statements as a result
of numerous factors, some of which may be beyond the Company's control. These
factors include: the availability of funds; the timing and content of work
programs; results of exploration activities and development of mineral
properties, the interpretation of drilling results and other geological data,
the uncertainties of resource and reserve estimations, receipt and security of
mineral property titles; project cost overruns or unanticipated costs and
expenses, fluctuations in metal prices; currency fluctuations; and general
market and industry conditions.

Forward-looking statements are based on the expectations and opinions of the
Company's management on the date the statements are made. The assumptions used
in the preparation of such statements, although considered reasonable at the
time of preparation, may prove to be imprecise and, as such, undue reliance
should not be placed on forward-looking statements.

________________________________________________________________________________
_ 
_______________

Endomines AB discloses the information provided herein pursuant to the Swedish
Securities Markets Act and/or the Swedish Financial Instruments Trading Act. The
information was submitted for publication at 08:45 CET on July 7th, 2014.

----------------------------------------------------------------------

[1] Production figures for Q2/2014 are partly based on company own assaying and
not confirmed by any external laboratory. Figures are individually rounded off.

[2] LTIFR = The Lost Time Injury Frequency Rate is based on reported lost time
injuries on a rolling 12-month bases resulting in one day/shift or more off work
per 1,000,000 hours worked. LTIFR has been calculated for the whole company
including contractors.

Attachments