Osisko Metals Extends L37 Deposit at Pine Point With 10.24% Zn+Pb Over 11.85 Metres


MONTREAL, Dec. 09, 2019 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX-V: OM; OTCQX: OMZNF; FRANKFURT: 0B51) is pleased to announce new assay results from recently completed exploration drill holes in the East Mill Zone (L37 deposit) at its wholly owned Pine Point Mining Camp (“PPMC”) in the Northwest Territories. Highlights include drill hole L37-19-PP-028 that intersected 9.46% zinc and 0.79% lead over 11.85 metres and drill hole L37-19-PP-035 that intersected 14.83% zinc and 4.45% lead over 4.68 metres. Eight of the nine intersections reported below (Table 1 and L37 Surface Map) were drilled outside the current mineral resource boundary at L37. All intersections are located between 16 to 45 metres vertical depth.

Table 1: Drill Highlights.

Hole NameZoneAreaFrom
(m)
To (m)Drilled
Width
(m)1
Outside Resource BoundaryZn (%)Pb (%)Pb + Zn (%)
L37-19-PP-024East MillL3728.5029.300.80Yes6.4413.6520.09
L37-19-PP-028East MillL3715.7027.5511.85Yes9.460.7910.24
L37-19-PP-029East MillL3738.5042.504.00Yes5.920.676.60
L37-19-PP-030East MillL3723.8024.801.00Yes9.141.8110.95
L37-19-PP-031East MillL3720.1524.154.00Yes5.230.745.97
L37-19-PP-035East MillL3727.1731.854.68Yes14.834.4519.28
L37-19-PP-041BEast MillL3722.7527.304.55Yes8.810.919.72
  and30.3034.203.90Yes10.864.4415.30
L37-19-PP-042East MillL3723.0027.004.00No8.812.9411.75

1 True width is expected to be between 95-100% of reported drilled width

Jeff Hussey, President & CEO of Osisko Metals, commented: “A substantial portion of our newly published 52.4Mt Inferred Mineral Resource Estimate (“MRE”) was dependent on Cominco Ltd.’s drilling. As Cominco Ltd. had different exploration objectives, many of the deposits outlined in our MRE remain open in all directions. These results demonstrate the upside potential of Pine Point, not just in identifying new exploration targets but also in expanding known mineralization across the Project area. With the forthcoming transition toward drilling untested gravity targets on the property over the coming days, we believe the best yet to come for Pine Point.”

The reported results reflect exploration efforts to connect areas of Inferred Mineral Resources. Drilling is on-going and expected to continue during the first quarter of 2020. The focus of the current drill program will transition from resource boundary expansion to drilling newly identified prismatic targets that can be associated with tabular channels. The Company believes that these channels, as well as vertical geological structures, are two controlling factors of prismatic deposit development that were not realized in the past.

Note regarding mineral resources and Qualified Persons

Mr. Robin Adair is the Qualified Person and the Vice President Exploration for Osisko Metals Incorporated. He is responsible for the technical data reported in this news release and a Professional Geologist registered in the North West Territories.

Quality Assurance / Quality Control

Osisko Metals adheres to a strict Quality Assurance and Quality Control program with regard to core handling, sampling, transportation of samples and lab analyses. Drill core samples from the Pine Point project area were securely transported to its core facility at the Pine Point site, Northwest Territories where they were logged and sampled. Samples selected for assay were shipped via secure transportation to the ALS Canada Ltd.’s preparation facility in Yellowknife. Pulps were analyzed at the ALS Canada Ltd. facility in North Vancouver, British Columbia. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for ultra-trace level detection for a multi-element suite with a 1% upper detection limit for base metals.  Samples reporting over 1% for Zn and 1% for Pb are analyzed by assay grade four acid digestion and ICP-AES analysis with an upper detection limit of 30% and 20% respectively.  Samples reporting Zn >30% and or Pb >20% are analyzed by traditional titration.

Table 2: Composite 2019 Assay Results from exploration drilling at the East Mill Zone.

Hole NameZoneAreaFrom
(m)
To (m)Drilled
Width
(m)
True
Width
(m)
Zn (%)Pb (%)Pb + Zn (%)
L37-19-PP-021East MillL37No Significant Results
L37-19-PP-023East MillL37No Significant Results
L37-19-PP-024East MillL3728.5029.300.800.806.4413.6520.09
L37-19-PP-025East MillL37No Significant Results
L37-19-PP-026East MillL37No Significant Results
L37-19-PP-027East MillL3726.4027.000.600.602.920.183.10
  and42.0043.001.001.001.530.071.60
L37-19-PP-028East MillL3715.7027.5511.8511.859.460.7910.24
L37-19-PP-029East MillL3738.5042.504.004.005.920.676.60
L37-19-PP-030East MillL3723.8024.801.001.009.141.8110.95
L37-19-PP-030East MillL3724.8027.502.702.702.790.283.08
L37-19-PP-031East MillL3720.1524.154.004.005.230.745.97
L37-19-PP-035East MillL3727.1731.854.684.6814.834.4519.28
L37-19-PP-036East MillL3727.9030.903.003.000.970.531.50
L37-19-PP-037East MillL3728.6931.652.962.962.950.063.02
L37-19-PP-041BEast MillL3722.7527.304.554.558.810.919.72
  and30.3034.203.903.9010.864.4415.30
L37-19-PP-042East MillL3723.0027.004.004.008.812.9411.75
L37-19-PP-061East MillL3723.7025.702.002.000.640.120.759
L37-19-PP-063East MillL37No Significant Results
L37-19-PP-064East MillL37No Significant Results
L37-19-PP-066East MillL37No Significant Results
L37-19-PP-067East MillL37No Significant Results
L37-19-PP-071East MillL3729.0030.001.001.005.450.706.15
L35-038-PP*East MillL3533.2036.002.802.806.700.487.18
  and43.3245.322.002.001.440.111.55
L36-314-PP*East MillL3634.5635.400.840.840.721.862.58
  and44.0045.001.001.0020.108.4128.51
  • Twinned holes for confirmation purposes


Table 3:
Drill Hole Collar Locations (UTM NAD83 Zone 11).

Hole NameZoneAreaEastingNorthingElevation (m)AzimuthDipDepth (m)
L37-19-PP-021East MillL37640422.906750042.00219.200.00-90.0042.00
L37-19-PP-023East MillL37640489.206749814.00219.230.00-90.0043.00
L37-19-PP-024East MillL37640236.906749959.00219.680.00-90.0045.00
L37-19-PP-025East MillL37640200.006749959.00220.610.00-90.0045.00
L37-19-PP-026East MillL37640100.906749992.00219.500.00-90.0048.00
L37-19-PP-027East MillL37640609.906750069.00219.210.00-90.0045.00
L37-19-PP-028East MillL37640675.506750099.00219.620.00-90.0048.00
L37-19-PP-029East MillL37640655.306750122.00219.460.00-90.0048.00
L37-19-PP-030East MillL37640553.906750129.00219.530.00-90.0036.00
L37-19-PP-031East MillL37640519.806750117.00219.480.00-90.0045.00
L37-19-PP-035East MillL37640379.706750003.00219.300.00-90.0042.00
L37-19-PP-036East MillL37640355.006749928.00219.770.00-90.0042.00
L37-19-PP-037East MillL37640324.806749978.00219.560.00-90.0042.00
L37-19-PP-041East MillL37640267.606749954.00219.280.00-90.0042.00
L37-19-PP-041BEast MillL37640268.106749954.00219.450.00-90.0042.00
L37-19-PP-042East MillL37640260.706749887.00219.880.00-90.0042.00
L37-19-PP-061East MillL37640633.406749939.00218.790.00-90.0039.00
L37-19-PP-063East MillL37640712.906749938.00218.880.00-90.0039.00
L37-19-PP-064East MillL37640753.506749925.00219.800.00-90.0039.00
L37-19-PP-066East MillL37640725.406749876.00218.660.00-90.0039.00
L37-19-PP-067East MillL37640687.006749834.00218.900.00-90.0039.00
L37-19-PP-071East MillL37640279.106749685.00219.760.00-90.0042.00
L35-038-PPEast MillL35642018.176751472.12216.840.00-90.0057.00
L36-314-PPEast MillL36641649.516750835.24216.730.00-90.0051.00

About Osisko Metals

Osisko Metals Incorporated is a Canadian exploration and development company creating value in the base metal space with a focus on zinc mineral assets. The Company controls Canada’s two premier zinc mining camps. The Company’s flagship properties are: 1) the Pine Point Mining Camp (“PPMC”), located in the Northwest Territories, has an Inferred Mineral Resource of 52.4 Mt grading 4.64% zinc and 1.83% lead (6.47% ZnEq), making it the largest pit-constrained zinc deposit in Canada (please refer to the Amended Technical Report filed on SEDAR for further information). The PPMC is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure and paved highway access and with 100 kilometres of viable haulage roads already in place. In 2019-2020, the company will explore for additional mineral resources and continue advancing the overall project. 2) The Bathurst Mining Camp (“BMC”), located in northern New Brunswick, has Indicated Mineral Resources of 1.96 Mt grading 5.77% zinc, 2.38% lead, 0.22% copper and 68.9g/t silver (9.00% ZnEq) and Inferred Mineral Resources of 3.85 Mt grading 5.34% zinc, 1.49% lead, 0.32% copper and 47.7 g/t silver (7.96% ZnEq) in the Key Ancon and Gilmour South deposits. In 2019-2020, the Company will continue to diligently develop and explore in order to confirm and grow both projects. The Company is also active in Quebec where it is testing multiple grass-roots base metal targets. The Mineral Resources mentioned in this press release conform to National Instrument 43-101 standards. These mineral resources were reported by the Company on December 6, 2018 and January 20, 2019 and were prepared by independent qualified persons, as defined by NI43 101 guidelines.

The above-mentioned mineral resources are not mineral reserves as they do not have demonstrated economic viability. The quantity and grade of the reported Inferred Mineral Resources are conceptual in nature and are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological grade and/or quality of continuity. Reference to historical production in this press release does not imply that any future mineral resources or discoveries will be of economic viability, nor does it imply that additional discoveries will be made. Zinc equivalency percentages are calculated using metal prices, forecasted metal recoveries, concentrate grades, transport costs, smelter payable metals and charges (see respective technical reports for details).

For further information on Osisko Metals, visit www.osiskometals.com or contact:

Jeff Hussey

President & CEO
Osisko Metals Incorporated
(514) 861-4441
Email: info@osiskometals.com
www.osiskometals.com
 

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the use of proceeds of the Offering; the timing and ability of the Corporation, if at all, to obtain final approval of the Offering from the TSX Venture Exchange; an exemption being available under MI 61-101 and Policy 5.9 of the TSX Venture Exchange from the minority shareholder approval and valuation requirements for each related party transaction; objectives, goals or future plans; statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Corporation's public documents filed on SEDAR at www.sedar.com. Although the Corporation believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/824939c6-cc8c-401e-a230-c7b6fb2ce03f

191202-Pine_Point_L37