Figure 1: Cross section of the Upper Beaver project showing the open pit, underground stopes, ramps and shaft to access the deposit.

Figure 1: Cross section of the Upper Beaver project showing the open pit, underground stopes, ramps and shaft to access the deposit.

Figure 1: Cross section of the Upper Beaver project showing the open pit, underground stopes, ramps and shaft to access the deposit.

Format

JPEG

Source

Osisko Gold Royalties Ltd.

Downloads