Figure 4

Image 4

Stream restoration in several sections of Bluff Creek is designed to improve stream flow properties and habitat quality. Shown above is a location where the eroded outside bank (left - April 2025) is in the process of being reconstructed (right - August 2025).

Format

PNG

Source

Highland Copper Company Inc.

Downloads