Figure 3

(A) Modelled depth to the unconformity within the Astro Project boundary (metres below ground).

(A) Modelled depth to the unconformity within the Astro Project boundary (metres below ground). The dashed orange box shows the area enlarged in Panel B. (B) The solid orange outline shows the part of CAUR’s interpreted lower-sandstone low-velocity corridor within the Astro Project boundary, over modelled basement conductivity from the 2025 ZTEM survey.

Format

PNG

Source

Global Uranium

Downloads