Figure 4

Figure 4

Grade-tonnage curve for the PIT-CONSTRAINED (open pit) resources (C$/t NSR cut-offs) in the Dundonald South Nickel Deposit. The C$52.50/tonne NSR is highlighted.

Format

PNG

Source

Class 1 Nickel and Technologies Limited

Downloads