Photo 1.

Photo 1.

RC drill program at VR’s Reveille silver-copper property in Nevada, March, 2021. Upper Photo: view north at drill hole RV21-003 with the drill rig on the T3 conductor shown in Figure 1, and the drill pad prepared on the G1 jasperoid target up the ridgeline, also shown on Figure 1. Lower photo: logging drill chips from 5 ft drill runs on the drill hole at T3.

Format

JPEG

Source

VR Resources

Downloads