Figure 1:

Figure 1:

Outline of the Project (black), proposed survey lines (yellow), and access roads (red polylines). The survey is estimated to comprise 86 line-km with a line spacing of 1,000 m and 250 m station spacing

Format

JPEG

Source

Pan American Energy Corp.

Downloads