Accessibility: Skip TopNav
Figure 3:
Visible awaruite grains measuring up to 544 microns in drill core from hole XL-26-16 at 214 meters downhole, within the coarser-grained interval that begins at approximately 175 meters, Alloy Max Zone, Pipestone XL Project.
Format
JPEG
Source
First Atlantic Nickel & Cobalt Corp.
Downloads
Original
Large
Medium
Small