Figure 1 Illustration of the location of drill hole P21-2331

Figure 1 Illustration of the location of drill hole P21-2331

Illustration of the location of drill hole P21-2331 in relation to last year’s drilling from drill pads Day-1 through Day-3. Planned underground development is shown in blue. Additional 2021 drill holes with assays pending from pad Day-4 are shown in dark green.

Format

PNG

Source

Ascot Resources Ltd.

Downloads