Figure 2

Figure 2

3D-cross section of drill holes from pad 23-BM1 drilled in westerly direction. High grade mineralization in hole P23-2484 apparently downfaulted by approximately 2 to 3 metres. The shallow gold intercepts are wireframed but are not included in the current mine plan due to proximity to surface. The Company will consider options for extraction by different mining methods in the future. Two historical holes have been added for further context.

Format

JPEG

Source

Ascot Resources Ltd.

Downloads