Proposed HBHM initial layout at Bonnie Claire. Wells (brown cylinders) are centered and spaced within a 280-foot diameter surveyed section. Slurry is hydraulically airlifted to a single directionally drilled production well offset from mined section center (blue cylinder). Note: the figure depicts 13 wells for illustrative purposes. Actual modelling is based on 32 wells.