Figure 1. Bonita Property, Nevada

Figure1 (002)

Summary of exploration work at the Bonita Property, 2014 - 2018, including locations of 2017 drill holes; the specific locations of 2018 drill holes at the Hemco target are shown in Figure 2.

Format

JPEG

Source

VR Resources

Downloads