Figure 1

Figure 1

Drill hole SFDH-048 and SFDH-050 long-section. SFDH-048 and SFDH-050 test the width of the SFdLA breccia pipe approximately 100 to 200m below Phase 2 drilling, in between the higher grade ends (‘lobes’) of the breccia. Mineralisation in these holes is focused on the margins of the breccia around a lower-grade core.

Format

PNG

Source

Turmalina Metals Corp.

Downloads