Location of the holes completed to date as part of Arras’ planned 30,000-metre drill program on the Beskauga Main deposit and wider area. The surface projection of the block model from the current NI-43-101 Mineral Resource Estimate is shown for copper. The inset map shows the location of Beskauga Main relative to Beskauga South (see Figure 2).