Figure 1

Figure 1 - Inclined long section through the planes of mineralization for Blocks 1 & 4 and Blocks 5 & 6 showing drill hole locations

Figure 1 - Inclined long section through the planes of mineralization for Blocks 1 & 4 and Blocks 5 & 6 showing drill hole locations and results reported in this press release. Significant intersects are calculated using a 0.3 g/t Au cutoff, 10 m minimum down hole length and 10 m maximum consecutive internal dilution. Included intersects are calculated using a 1.5 g/t Au cutoff, 3 m minimum down hole length and 2 m maximum consecutive internal dilution.

Format

PNG

Source

Reunion Gold Corporation

Downloads