Figure 3. Map showing location of 2023-2024 till sampling grid with sampled and non-sampled sites displayed. Non-sampled sites were due to lack of viable sample material and/or swampy terrain.

Figure 3 2025-4-15.jpg

Figure 3. Map showing location of 2023-2024 till sampling grid with sampled and non-sampled sites displayed. Non-sampled sites were due to lack of viable sample material and/or swampy terrain.

Format

JPEG

Source

West Red Lake Gold Mines Ltd.

Downloads