Figure 2

picture 2

Figure 2 – Part of Phase 2 upgrades include upgraded tanks going in to increase contribution margins by enabling the use of lower cost pre-treatment chemicals for concentrate production. As pictured, the concrete support was poured in Aug and the new tanks which are onsite will be put in place very soon after the curing process.