Figure 1

Figure 1

Location of the initial kick off to 2026’s phase of drilling at the Trapper Zone, showing the total magnetic intensity (“TMI”) of the 2025 Trapper Zone ground magnetic survey as well as the grid for the MRE drill program to be completed in 2026.

Format

PNG

Source

SAGA Metals Corp.

Downloads