FIGURE 11. Plan view showing Rowan Veins 001, 003, 004, 006b and 013 with proposed infill and conversion drilling and current PEA underground mine design. Vein 1 west extension target outlined in red.

Rowan_Figure10

FIGURE 11. Plan view showing Rowan Veins 001, 003, 004, 006b and 013 with proposed infill and conversion drilling and current PEA underground mine design[2]. Vein 1 west extension target outlined in red.

Format

JPEG

Source

West Red Lake Gold Mines Ltd.

Downloads