FIGURE 5. Long Section showing drill highlights from current press release in Austin 904 Complex with (grade x thickness) at ≥ 25 (g/t Au x m). Interval length denotes downhole core length.
FIGURE 5. Long Section showing drill highlights from current press release in Austin 904 Complex with (grade x thickness) at ≥ 25 (g/t Au x m). Interval length denotes downhole core length. True thickness has not been calculated, but is expected to be ≥ 70% of downhole length based on intercept angles observed in the drill core.[2][2] Mineral resources are estimated at a cut-off grade of 3.38 g/t Au and a gold price of US1,800/oz. Please refer to the technical report entitled “NI 43-101 Technical Report and Prefeasibility Study for the Madsen Mine, Ontario, Canada”, prepared by SRK Consulting (Canada) Inc. and dated January 7, 2025 (the “Madsen Report”). A full copy of the Madsen Report is available on the Company’s website and on SEDAR+ at www.sedarplus.ca.