Figure 4

Figure 4

Figure 4. Plan map highlighting the 2022 Xcite TDEM survey completed on the Ascent Project. General drill target areas are circled in red. Anomalous uranium, historical drilling, interpreted faults, and local EM conductors are also displayed.

Format

PNG

Source

Standard Uranium Ltd.

Downloads