Figure 2

Figure 2

Location of the Fall 2025 phase of drilling at Trapper Zone, showing the TMI of the 2025 Trapper Zone ground magnetic survey as well as the grid for the MRE drill program to be completed in 2026.

Format

JPEG

Source

SAGA Metals Corp.

Downloads