Location of the holes completed to date as part of Arras’ planned 30,000-metre drill program on the Beskauga Main deposit and wider area. The surface projection of the block model from the current NI-43-101 Mineral Resource Estimate is shown for copper. Map also showing position of cross-section A-A’, located 1.0 km from the Beskauga main deposit, with NW-SE drilling fence of drill holes Bg23025, Bg23026 and Bg23027.