FIGURE 6. Long Section showing drill highlights from current press release in Austin 904 and 955 Complexes with (grade x thickness) at ≥ 25 (g/t Au x m).
FIGURE 6. Long Section showing drill highlights from current press release in Austin 904 and 955 Complexes with (grade x thickness) at ≥ 25 (g/t Au x m). Interval length denotes downhole core length. True thickness has not been calculated, but is expected to be ≥ 70% of downhole length based on intercept angles observed in the drill core.[1][1] Mineral resources are estimated at a cut-off grade of 3.38 g/t Au and a gold price of US1,800/oz. Please refer to the technical report entitled “NI 43-101 Technical Report and Prefeasibility Study for the Madsen Mine, Ontario, Canada”, prepared by SRK Consulting (Canada) Inc. and dated April 30, 2026 with an effective date of January 7, 2025 (the “Madsen Report”). A full copy of the Madsen Report is available on the Company’s website and on SEDAR+ at www.sedarplus.ca.