Figure 12

Yellowknife sections Proposed-Ki

Cross section through the Ki pegmatite showing closely-spaced dykes, holes reported from the 2023 program, and one of the planned 2024 drill holes.

Format

JPEG

Source

Li-FT Power Ltd.

Downloads