Figure 2

Figure 2: 2023 completed drill holes on the Big Mack and Eleven Zones showing pegmatite intercepts – assays pending (with the exception of BM23-001)

2023 completed drill holes on the Big Mack and Eleven Zones showing pegmatite intercepts – assays pending (with the exception of BM23-001)

Format

PNG

Source

Pan American Energy Corp.

Downloads