Figure 1

Figure 1

Alexo-Dundonald Nickel Sulphide Project showing the location of the 4 nickel deposits and the optimized pit shell outlines for Alexo North and South and Dundonald South deposits, overlain on the generalized geology within the Project. The yellow oval at the Dundonald North Deposit is not an optimized pit shell but rather outlines the approximate area of the 2020 mineral resource estimate reported by Stone et al. (2020).

Format

JPEG

Source

Class 1 Nickel and Technologies Limited

Downloads