Figure 4

Figure 4

Surface infrastructure as of April 2023 at the Caraíba Operations' new external shaft, including (A) the stage winder foundation, (B) shaft collar, (C) center tower steel erection, (D) foundation and exterior steel frame for the permanent rock and personnel winders, and (E) headgear steel erection.

Format

PNG

Source

Ero Copper Corp.

Downloads