October 17, 2019 Cross Section 16750E

October 17, 2019 Cross Section 16750E

Figure 2: Cross section 16750E (View NE) showing drill hole MA-19-442 with assay intervals of 2.17 g/t Au over 52.0 meters including 7.14 g/t Au over 5.0 meters as well as 4.84 g/t Au over 3.0 meters and 3.30 g/t Au over 4.0 meters in gentle SW dipping en-echelon stacked QTP veining.

Format

JPEG

Source

Marathon Gold Corporation

Downloads