Figure 1 – Modelled geologic domains

Figure 1 – Modelled geologic domains

The estimated in-place resource at Halleck Creek is 1.43 billion tonnes with an average TREO grade of 3,309 ppm , and an average NdPr grade of 734 ppm (Table 1). Total estimated indicated resources comprise approximately 43.5%, with 56.5% as inferred resources across the project area.

Format

PNG

Source

American Rare Earths

Downloads