Figure 2

Figure 2

Trapper Zone map outlining location of the initial 2026 focus for the remainder of the MRE drill program to be completed in 2026, including cross-sections N11, S11, S8 S7, S6 and longitudinal section CC, showing the TMI of the 2025 Trapper Zone ground magnetic survey. Drilling will commence in Trapper South and move to Trapper North.

Format

PNG

Source

SAGA Metals Corp.

Downloads