Plan map of the Kraken Main Zone showing 2026 step-out drilling across 3 kilometres of the Main Zone, historical drilling and representative photographs of sulphide textures observed in drill core. Drill core is BTW size with a diameter of 4.2 cm (1.65”) Visual observations have not been confirmed by laboratory analysis. Reported intervals represent downhole lengths; true thicknesses are not yet known.