Figure 1

Figure 1

2018 drilling as well as hole CDR-20-08A was done from the west and the 2020 directional program as well as the follow up hole beneath Zone 21 was done from the East/North side of the deposit.

Format

PNG

Source

DORÉ COPPER MINING CORP

Downloads